Here was my attempt to take the same photo of the historical one. This is back in 2003, and my wife (who is standing where one of the trainmen did) and I were B&W photo fans.
Reflections on, insights about, research into, and visits to the remnants of the Colorado and Southern narrow gauge.
Saturday, October 24, 2026
Friday, September 25, 2026
Alpine Tunnel on Two Wheels
I happened on the video below and thought it was worth sharing. Yes, it is a couple guys on electric dirt bikes, but they do a nice job showing the amazing scenery and engineering of the west side of Alpine/Altman Pass. It is peppered with occasional narration about the railroad and the facilities at the west portal. Some of it is a little off (i.e. the main freight hauled was coal not silver), but most is correct. Either way, it's always a joy to see this amazing line. The one part that saddens me is to see all the hard-won restoration work on the west portal facilities accomplished by Ray Rossman and the Passport In Time program slowly disintegrating. Their work, done from the 1990s through the early 2000s and building on past preservation efforts, revitalized so many of the ruins there. Now, however, paint is pealing, weather (and vandalism or, at least, carelessness) is taking its toll, and nature is again fighting to reclaim its place.
Sunday, September 20, 2026
Signs of Life on the Gunnison Branch, 1912-1915
There’s something exciting about activity on a dormant railroad track. A few such activities between 1912-1915 came to my attention recently related to the Gunnison branch.
| C&S grade west of Hancock |
For two years the track above Hancock lay dormant when the railroad needed a bit of 56 lb. rail, presumably to replace rail elsewhere on active track. In late summer, August 1912 the C&S sent a crew to pull up a half mile of 56 lb. rail a little west of Hancock. The curious part is that, even though the track there remained inactive, the crew replaced that half mile when they re-laid aged 35 lb. rail.
| Garo 2017. By Jeffrey Beall - Own work, CC BY 4.0 |
came back to life briefly. After two years of inactivity, on the night of November 11, 1912, an Alma newspaper reported the C&S ran a train “up for Garo and handled ten cars of freight from Cohen’s spur.” During the intervening years, wires had even been put up across the tracks. The crew had to cut these to get the train through. Interestingly, the newspaper also stated, “There have been reports before that the railroad was running trains at night over parts of this road, but it has been impossible to learn anything definite until recently.”
![]() |
| Grading on the old Gunnison branch in Como, 2021 |
![]() |
| You can see the Gunnison tracks in the top right corner, 2026 |
Sources:
Thursday, July 16, 2026
Alpine Tunnel: The Problem of Clearance, part 2
Restricting the brakemens’ work was only one of the many problems caused by the tight clearances of Alpine Tunnel. Sometimes equipment simply didn’t fit, like when the rotary snowplow had to go through the tunnel during the winter of 1904-1905. A number of inches had to be cut off some timbers just to get it through when westbound. On the way back eastward, three inches needed to be cut off the already cut timbers to get the machine through again. Owing to this hatchet work, a telegram was later sent from Alpine Tunnel station to report that some of these timbers were now moving inward.
![]() |
| Rotary just outside of the east portal (from Historic Alpine Tunnel) |
New timbers were sent shortly after the above telegram, but within several months of the repairs, four timbers were found to be “kicking in.” In September of 1906 the Bridges & Buildings foreman inspected the tunnel and noted that “conditions grow worse as the mountain crowds the timbers.” He recommended certain sections of timbers to be removed and reinstalled farther back in the wall to widen the tunnel.
Rotaries were not the only pieces of rolling stock with difficulties in the tunnel either. In November of 1907 a gondola, whose sides had bowed out a foot, scraped on the sides of the tunnel timbers. An additional problem was the buildup of ice on the timbers. As the ice accumulated, it stuck out and cars ground into these while traveling through the bore.
| Gondola 4319, the only known surviving C&S gondola, on display in Central City (Tim Bain photo). The car is now excellently restored in Como |
The Alpine Tunnel, like the famous ocean liner Titanic, is a curious study in a glorious venture that went wrong. How the great Alpine Tunnel project went wrong still fascinates many, and to the list of problems that brought this ‘ship’ down, must be added, clearance. It may not be as epic as the Goliath-sized snow drifts that buried the line, but clearance and moving timbers were a continual battering in the hull of the tunnel that helped bring the bore down in the end.
Below is an interview with George Champion who piloted the last rotary through Alpine Tunnel in 1910.
Tuesday, July 14, 2026
Alpine Tunnel: The Problem of Clearance, part 1
![]() |
| part of a map from the VHS of the video inside the tunnel |
of the tunnel’s abandoned interior, this video footage truly gave the sense of the tight inky blackness of being inside the fabled bore. Yet, the narrow confines of walking the tunnel are no comparison to trying to operate full-sized narrow-gauge trains through it as a recent reread of a few pages of Colorado Annual 12 made clear.
A laundry list of problems plagued the Hancock to Quartz segment of the C&S including long stretches of 4% grades, long winters at altitudes above 10,000 feet, rock slides on the western side of the pass, and lack of sun to melt the snow on the east side along with much drifting of the dry snow. The missing sunlight on the eastern slopes did, however, reach the higher mountain peaks creating slushy snow that eventually came down the mountain onto the track. One other problem not related to grades or weather, though, was that of clearance in Alpine Tunnel itself.
![]() |
| A display mirroring the tunnel's arch |
The Alpine Tunnel was a mere 14 feet high above the rails. This left just a little over a foot of distance to the ceiling above many locomotive smoke stacks and roughly 24 inches above boxcar brake wheels. By comparison, these clearances were two or more feet smaller than those of most snowsheds on the line. The width was similarly tight: 2 1/2 feet less in width than other C&S bridge structures or snowsheds.
One quickly wonders what brakemen who were needed on the top of cars to turn the brake wheels were to do in this circumstance, particularly considering that eastbound trains had the double danger of going downhill once passing the apex of the tunnel and then facing a sharp 24-degree curve just outside of the east portal. Since the tops of high cars was out of the question due to the height restriction, brakemen chose to find two gondolas with brake wheels on adjoining sides. This allowed them to do what is called “double brakes” (though, this didn’t keep them from the inevitable smoke inhalation of the belching locomotives). Still, many trains exiting the east portal were out of control. It could take all three miles from the tunnel to Hancock to finally stop a train. Of course, some were not so lucky and left the rails.
| A westbound train at the west portal station. From Historic Alpine Tunnel by Dow Helmers |
Part 2 of this exploration will be posted in the next few days.
Sunday, June 21, 2026
Interpretive Signs at Alpine Tunnel
I just found an old video by the organization that installed the excellent interpretive signs from Quartz to the West Portal of Alpine Tunnel. They mention their work there briefly in the video.
The work was dedicated in the spring of 2013.
The group's name was the Interpretive Association of Western Colorado. Unfortunately, it seems the group is no longer around, or at least its website is no longer functioning.
Monday, April 13, 2026
Saving the Alpine Tunnel Historic District in 1994
In April of 1994 Ray Rossman, East Zone Heritage Resource Manager for the U.S. Forest Service in Gunnison, filled out an important document that helped set in motion the tremendous restoration and historical work done to the Alpine Tunnel district. That document was the "National Register of Historic Places Registration Form." It was "for use in nominating or requesting determination for individual properties and districts." I discovered this form online here.
In the form, Rossman names the stretch "along DSP&P railbed from Quartz to Hancock" as the "Alpine Tunnel Historic District." The area is spelled out more specifically later as
"from the bridge crossing Chalk Creek at the Hancock townsite to the intersection of the railbed with the Cumberland Pass Wagon Road within the townsite of Quartz." Also, "The boundary runs 100 feet on either side of the railbed centerline for approximately 13.8 miles. Three hundred feet of the former Atlantic rail spur northwest of the east portal. The district also includes the historic trail over Altman Pass."
The form is quite extensive, including a narrative description, a map, topographical details, a list of contributing and noncontributing structures and sites, a statement of historical, engineering, transportation, and informational significance, geographical data, present property owners along the route, and a photograph log (with accompanying photos).
It is an interest document to peruse. I include below a few interesting excerpts with a few notable points in bold:
Alpine Tunnel station/telegraph office
The Mile-Hi Jeep Club recently restored the [Alpine Tunnel telegraph office] and removed the extension. The only deviation from the original construction is the replacement of the tar paper roof with steel roofing material. The building retains its historic integrity, is the best preserved structure at the station complex, and is a contributing building in the district.Outhouse
"A two-hole outhouse/privy is located 35 feet west of the boarding house. The building has partially fallen over. This was the second outhouse constructed. Photographic evidence suggests the original structure was located directly west of the front entrance of the engine house."The Storage Cellar
"A covered storage cellar is located 20 feet south of the boarding house. Entrance was gained though a covered walkway that extended from the front porch of the boarding house. Today the structure has lost its metal roof and the stone walls are leaning inward."The Coaling Platform
"Forty feet south of the cellar are the standing timbers of a 16'x 32' coaling platform. Coated by creosote, the structure has remained in good condition. The eastern side has shown the most deterioration. The structure contributes to the district."Future Plans (includes rebuilding the boarding house!)
"Future management plans for the Alpine Tunnel Station complex calls for the restoration of the coaling platform, outhouse and storage cellar. The ultimate goal calls for the restoration of the facility to its 1910 configuration including the rebuilding of the two story wooden boarding house."Tunnel Gulch Water Tank
About a half mile downgrade a new water tank, the Tunnel Gulch water tank, was built after the avalanche. The Tunnel Gulch water tank. This structure was stabilized and restored by the Mile High Jeep Club. The tank is one of the best examples of the typical water tanks used along the South Park rail system. The structure contributes to the district."The Tunnel Interior
"The interior, though not easily accessible, remains in moderately good condition. There are two minor rock falls and a major tunnel collapse within the tunnel. The most significant is a 300-350 foot section which collapsed and completely sealed off the eastern portal. The western portal, faced with locally quarried hand-cut granite stones, has been covered by talus debris and has suffered only minor damage. Several support beams throughout the tunnel have also collapsed. In addition, a white mold covers some of the interior redwood timbers. The original rails and ties extend the length of the tunnel. These rails represent the only portion of the entire DSP&P rail system that remains intact. Water covers a portion of the railbed at both ends where the tunnel is sealed off. The snowsheds that protected both portals have totally collapsed and decayed. The east portal was constructed directly into solid granite and required no external facing. The tunnel is a contributing structure in the district."The Stone Section House
"The stone section house was an "L" shaped structure built in 1881. It functioned as the original boarding house for the assigned complex crew members. The initial construction measured 55'x 30' and had a 25'x 16' addition added to the northeast corner prior to 1896. The corner, window, door and sill stones are of native hand-cut granite. The walls were constructed with random sized native stone material. Based upon photo evidence this facility was abandoned by 1896. Today only foundations and segments of the lower walls remain visible."More gems can be found throughout the document.
Curiously, there is a stamp on this document stating that it was received in 1996. That is a roughly two-year gap between when Rossman completed it and it was received. I'm not sure why this is.
Also, here is an interesting photo of a culvert in the form that I didn't know about.
Sunday, March 8, 2026
Discovered! The end-of-track after Alpine Tunnel dismantling
I've always wanted to find the spot where the rails left behind after the 1923/1924 dismantling work stopped. Using Google Earth I was able to pinpoint the spot.
I matched up the below screenshot from Google Earth with one of the photos of the end-of-track and then placed a pin on the DSP&P overlay on Google Earth. I was particularly trying to line up both a turn to the right of the roadbed, a rocky embankment on the right, and a similar background of the mountain contour and trees.
![]() |
| June 24, 1956 R.H. Kindig photo from Tom & Denise Klinger's Gunnison Memories and Then Some |
Saturday, March 7, 2026
First rail removal near Alpine Tunnel station in 1940
It appears that the first removal of rail from the remaining mile from the east portal to some point down the western slope took place in 1940 and it included rail (at least) running between the engine house and stone section house ruins and the depot and two-story section house.
First, it is clear that rail was present at this location in 1939, roughly 16 years after the Quartz to Hancock section was officially scrapped, as seen in the 3 photos below.
1939
| Aug. 6, 1939 R.H. Kindig - James Ehernberger Collection-Gunnison Memories |
| June 1939 Donald E. A. Rogers |
| June 1939 Donald E.A. Rogers |
Undated (possibly June 1939)
The next 2 photos are telling. The first (A), from June of 1940 shows the mainline and passing track still in place between the station and engine house.
1940
| PHOTO A: June 1940 Richard Kindig Mineral Belt 2 |
This next photo (B) is also dated as 1940, but the rail seems to be freshly removed as demonstrated by the discoloration on the ties. The photo does not have a month listed, so it appears that all we know is that sometime after June of 1940 some (not all, as upcoming posts will show) rail was removed in the vicinity of the Alpine Tunnel station complex.
| PHOTO B: 1940 John W. Maxwell The South Park Line |
Sunday, March 1, 2026
A gallery of rail removal at Alpine Tunnel 1939-1960
About a mile of DSP&P/C&S trackage was left in place after the 1923/1924 scrapping of the Alpine Tunnel line between Quartz and Hancock. This included track inside the tunnel and west a bit downgrade beyond the Alpine Tunnel facilities. I am trying to piece together when the tracks were removed. This seems to have been done in different segments and not all in order.
Below is a collection of photos showing the progression. I hope to analyze what can be determined from the photos. Keep a look out for future posts where I will identify locations and observations of these images. If anyone knows more or can provide other photographs, please chime in. I'm eager to learn.
1939
| Aug. 6, 1939 R.H. Kindig - James Ehernberger Collection-Gunnison Memories |
| June 1939 Donald E. A. Rogers |
| June 1939 Donald E.A. Rogers |
Undated (possibly June 1939)
| D.E. Rogers Mineral Belt 2 |
1940
| June 1940 Richard Kindig Mineral Belt 2 |
| 1940 John W. Maxwell The South Park Line |
1948
1949
| July 19, 1949 |
1953
| Richard Kindig 1953 |
Mid-1950s (correct?)
| Neal Miller, Author's collection |
1955
| Aug 13 1955 Art Wallace - 2002 The Bogies & the Loop |
1956
| Bob Richardson RR-1275 Denver Public Library |
1950s
| Al Chione, 1950s? Ted Weise collection |
1956
| R.H. Kindig - James Ehernberger collection - Gunnison Memories |
1957
| Sept. 1957 Ed Haley Mineral Belt 2 |
| Sept. 1957 Ed Haley Mineral Belt 2 |
1958
| June 29, 1958 Lew Schneider |
| June 29, 1958 Lew Schneider |
| June 29, 1958 Lew Schneider |
Mid-1950s (correct?)
| Neal Miller Gunnison Memories |
| Mid-1950s Neal Miller-Author's collection |
| Mid-1950s Neal Miller Gunnison Memories |
1960
“Until mid-summer of 1960 the ensuing three miles of grade was impassable to truck or jeep. Huge granite boulders and rock slides had blocked the way, filling cuts and narrowing the passage. In the summer of 1960, Gunnison County sent a “Cat” to clear the way to Alpine. The road could hardly be designated as a Freeway, but it is easily passable for Jeeps and trucks. The grade, of course, is not steep, the problem being to have sufficient clearance under the vehicle to avoid damage from rocks.” Historic Alpine Tunnel by Dow Helmers p. 96












